Fuselage September 2006 Updates
September 30, 2006
Fuel Pump Enclosure.... - 2.0 hrs

Installed the rest of the nutplates and clecoed the enclosure together. Looks good ready to install. Almost. Next I have to install the fuel pump and cleco in place in the plane. Then run the tubing up to the valve.

I was reading on Van's Airforce Forum about torque and torque values and it got me thinking about getting a different type of wrench that would be better suited for this type of work. I bought the one in he picture that Proto makes from Stanley. It is a dial type and makes things more easy and exact. I am going to replace some bolts and retorque as tests.

This is the last update for September. Off to Austin to see The Univeristy of TEXAS play tonight.

This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.