Fuselage September 2006 Updates
September 28, 2006
Floor Rib Fix.... - 2.0 hrs

Started out tonight fixing the floor ribs. It always bugs me when I see something wrong until I fix it so I have to stop what I am working on and fix that first. And then that worked into seeing how the control rig mounts on the bearing blocks in the 704 bulkhead. These are going to need some more work so then I stopped and went back to the fuelpump mount.

Started riveting the nutplates to the fuel pump base. Tired so calling it a night.


This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.