Fuselage September 2005 Updates
September 25, 2005
Continued with Seat Backs - 2 hrs
Man is it hot after a Hurricane! Got the shop cleaned back out mostly and back to building. I continued on with the left seat back that I had started riveting. There are basically 3 sizes of rivets so you have to be on the lookout for the changes as you move around the structure. One side down one to go.
Moved on to the right seat. Stripped the plastic from the seat back, deburred and prepped for priming and then primed to prepare for final paint.