Home
Preparation
Empennage
Wings
Fuselage
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage September 2006 Updates
September 24, 2006
High Pressure Fuel Pump.... - 3.0 hrs
Well today is a new day. I removed the forward fuse structure and panel to give me room in the front to work. I really needed to get the complete fixture installed to get where all of the nutplates go. Once I know how everyting fits I will try each tube one by one like Dan C did. Looks like that makes more since. Plus it might keep me from blowing my brains out! Drilled the mounting holes to prepare for the nutplates.
Next I removed the selector plate and cut the bolt bushings and drilled the bolt holes and valve shaft hole to fit. Mounted the selector valve.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |