Home
Preparation
Empennage
Wings
Fuselage
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage September 2006 Updates
September 7, 2006
Flap motor assembly and G Weldment sealing.... - 2.0 hrs
Had some old proseal about to expire so I pulled it out of the fridge last night to get room temp. Nasty stuff. I have a pnuematic proseal gun that really helps that I bought on Ebay last year. After mixing up I shot a bead around each weldment and the brake fittings to seal up any leaks from under the fuselage.
Match drilled the rear flap channel with the side panels then removed and installed nut plates.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |