Home
Preparation
Empennage
Wings
Fuselage
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage September 2005 Updates
September 6, 2005
Parts Fabrication - Seats..... - 3.0 hrs
Riveted the tunnel cover top plate to the side channels.
Next I used the chop saw to cut the 4 angle braces for the set backs. Cut the bottom 45 degree angles and rounded off the tops to a 3/8 radius using a dime as a template. I ground everything smooth with the scotchbrite wheel and polished up with the die grinder.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |