Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage October 2007 Updates
October 29, 2007
Panel Frame.... - 2.0 hrs
Well one more step closer to the start of wiring. Tonight I put the panel frame in place. Turns out I need to locate the instruction sheet. I don't seem to have enough screws.
After I got home and located the sheet it actully says to use rivets for the top 2 angle pieces. That does not make any sense as the screws allow you to remove the panel pieces and the screws underneath the panel allow you to remove the frame.
Need a bit more research before proceeding. Halloween night will be the next attempt. At least I got to attach my first cable to the FastStack ProG Hub.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |