Home
Preparation
Empennage
Wings
Fuselage
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage October 2006 Updates
October 15, 2006
Fuel Pump to Valve Lines.... - 2 hrs
More bending of tubing. 3/8 inch for the fuel lines from pump to valve. This is taking me forever. Today I got 2 more done but when I checked the pump cover for clearance of the front bend that supplies the pump filter with fuel from the valve connection it turned out to be about an inch too long.
Going to take a brake and see if I can make this one fit. If not then I will have to redo it all over. This is already the second attempt on this line.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |