Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage November 2007 Updates
November 14, 2007
Panel Frame and Wiring.... - 2.0 hrs
Tonight I started installing the panel frame again. This time should be for good so I installed the screws that hold the frame to the fuselage side on the pilot side. This took awhile since there is not much room to get the bolt and washer over the screws. I am using hex head screws to match the rest of the panel screws as well.
Once I got the frame in position I had to snake the harness wires thru the holes in the subpanel. Now all harnesses are hooked up to the FastStack ProG hub except for the autopilot harness.
I installed the transponder and comm radio. Turns out I installed the harness bracket for the audio panel upside down so I need to redo that again.
Should be able to finish the right side bracket and get the audiopanel connection corrected tomorrow.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |