Fuselage November 2005 Updates
November 5, 2005
Longerons - 3 hrs

Finally completed the longeron bending. I actually over did the 2nd one but was able to tweak it back into shape.

I edge prepped the aft decks and clamped into position for drilling. Back drilled the deck holes into the longeron. Clecoed as I went as usual. Moved on the the left one and am ready for the down bend and twist.


This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.