Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage May 2007 Updates
May 29, 2007
HS and Rudder pedals - 3 hr
After work I went to the storage place to pic up the HS and Elevators to move to the hangar. I removed the blue plastic and clamped the HS in place on the back of the fuselage. I forgot the dang camera. Guess I can take some pics tomorrow.
Now that the rudder pedals are painted black I used the new bolts I bought and installed the brake pedals. I didn't want the slop that having 2 bolts on each pedal was providing so I upgraded to one long bolt for each pedal. After installing the castle nuts I installed the cotter pins.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |