Fuselage May 2007 Updates
May 25, 2007
Moving to the Hangar - 4 hr

Its time to move the bird to the new nest. Today I took vacation to get some stuff moved from the garage to make room for the move tommorrow to the hangar. Today I wanted to get the tools and a bunch of some of the little stuff moved to the hangar. Also wanted to get the workbench moved over which would allow room around the plane to make it easier to get loaded on the truck.

Harley Dave showed up with his truck and my sweetie Kim also helped load up stuff. This came in really handy especially since I hurt my back the first thing in the morning preparing the plane for moving. I was putting in the baggage bulkhead and installing the fuelpump cover etc. I turned a certain way while bending over the edge of the plane. Talk about bad timing. Anyway thanks to good friends we were able to get the bench and some other stuff moved over. Dave Jr. also showed up and helped with loading the bench. Tommorrow will be the big day!




This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.