Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage May 2007 Updates
May 20, 2007
Canopy Top Track & Rudder Pedals - 4 hr
Getting ready to reinstall the rudder peddals and complete installing before I rivet in the center firewall section. I went to a flyin on Saturday and saw some pedals done in black. Since I am going with the black on the canopy frame and rails I decided to do that as well so I primed and painted the left side pedal.
While I was waiting for the different coats to dry I started installing the canopy track. I had drilled to holes already so I installed those screws first and then drilled the other holes with it screwed down tight. Also drilled the hole in the baggage top wall for the threaded rod which holds the front of the track.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |