Home
Preparation
Empennage
Wings
Fuselage
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage March 2005 Updates
March 24, 2005
F-704 Bulkhead
Fabricated flap control brackets and test fit flap control mechanism. This is mainly drilling holes and cleaning up the rough edges. Moved onto forward bulkhead.
Riveted side braces in place. Riveted the forward panel braces in place. Notice the nice snap bushings to keep the wire from chaffing.
Clecoed forward and aft bulkheads together with side panels. It says to not rivet at this point as the side skins get connected to this structure. This completes the center bulkhead. This part is pretty heavy.
Time to move onto the F-705 bulkhead.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |