Fuselage March 2006 Updates
March 13, 2006
Joining the Center and Aft Fuse - 2 hrs

Well since these 2 pieces are ready to go I clamped the longerons to the side skins in several areas. Next I removed the clecos along the bottom skin and F706 bulkhead. I slid the 2 sections together and tried to work the aft bottom skin and F706 bulkhead in between the center section bottom skin and the baggage bulkhead.

Needless to say this was easier said than done. I was finally able to get it started by using a 3/32 punch into the corner hole. Then I kept working along from each side. This took quite a while but I finally got the bottom edge of the F706 bulkhead complete.

Next I will try the side skins.




This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.