Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage June 2007 Updates
June 28, 2007
Elevator Stop Fabrication.... - 2.0 hrs
Finished up the elevator stop. Tonight before I cut the top edge down to 3/4 inch I marked and drilled the holes. 5 on the bottom and 2 on the top. Then I cut the top edge down and finished up on the sander and grinder. Last I polished up with the scotch bright pad. Came out really nice.
Next I installed the forward fuselage again. I want to get the frame for the panel installed so when the EFIS shows up in a few days I can measure the cut outs in the back subpanel.
A storm was coming but then passed to the north of the airport which left with a pretty sunset. I threw in a few shots of that.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |