Fuselage June 2007 Updates
June 18, 2007
HS Spacer Fabrication.... - 1.0 hrs


Jumped over to the hangar to knock out a couple of parts. When I pulled into the airport there was a 7A parked next to Carl's BBQ. The owner was getting in for a trip back to San Antonio. I snapped a quick pic on engine start.

I fabed up the 2 spacers that go in between the aft deck and the horizontal stabilizer. Next I will make the elevator stop.





This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.