Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage June 2007 Updates
June 07, 2007
Beer.... - 0.0 hrs
Yep you will not belive this. I went to the hangar to work on the plane and guess what happened. My great helper Jon showed up since he sold his 6A. I know that is a whole other story. Anyway he showed up and at the same time Jim Kiloh showed up.
Jim had never been by the hangar since I have had it and decided to stop by on his way home from work. Anyway we were trying to work and he made us stop and drink beer. You know how it goes. You don't want to be a bad host so you have to do it right. Just kidding Jim. Stop by anytime. I need to come checkout your bird also. You are really close to first flight.
Anyway it was nice to have visitors as I was not much into building tonight anyway getting a late start. Anyway in an effort to show some work done the pics show the elevators in place to check alignmentof the bearings. Everything checks out so I guess the next step is to fab up the spacers and mount the HS and then elevators can be put on for drilling and rigging.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |