Home
Preparation
Empennage
Wings
Fuselage
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage July 2006 Updates
July 23, 2006
Misc. and getting reading for the rotating stand.... - 5.0 hrs
Had a bunch of misc. stuff to get done. First I installed the bolts on the bottom longerons. There are 5 on each side. Actually I should of done this while the bottom skin was off. Next I riveted the armrests to the F705 bulkhead. There are 3 there and one at the 704. The single front rivet gets done later with a pop rivet when you install the channel covers permantly.
By then it was too hot to get the baggage ribs done so I move on to rotating stand. First I mounted the aluminum side angles using the wood blocks and bolts thru the motor mount holes. Next I drilled the bolt holes to allow the square tubing that holds the front of the plane.
I read thru the plans and got the next steps down. Should be able to get this thing mounted and flipped this week.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |