Fuselage January 2008 Updates
January 20, 2008
More wiring.... - 6.0 hrs

Got to the hangar early. Very cold but the wind was down and very sunny so even though it was 37 it was warming qucik. First I finished up the flap switch.

I put the panel back in so I can start testing eveything with regard to the wiring. I installed the SL-30 install tube with the connectors on the back. Next I slid the SL-30 and checked to make sure it would slide it smoothly. Everything checked out great.

Hooked up the power wires and ground from the wiring harness. Hooked up the harness connections to the Fast Stack.

Jon and Jim stopped by. Ran the marker beacon and nav coax to the wings. Reran the wires up the center channel. This will keep anything from going up the sides. Jon helped me fab up a another bracket to hold 2 more adel clamps to hold the wires tight down where the brakelines make the turn against the firewall.


This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.