Fuselage February 2007 Updates
February 21, 2007
Strobe Pak.... - 1 hrs

Harley Dave got me another sign for the hangar. Had to take a few things to the hangar to slowly get things moved over there so I took the sign with me and hung it over the door.

When I got back to the shop at home I figured I would try unclecoing the top edge of the strobe attach plate and pulling the rivets from the top of the j-stringer. It is really the only way to get the rivet puller in there. It was tight but it worked. Then I bent it back in place and pulled the top edge from the top as well. Screwed the strobe power pak in place and its ready to wire up.



This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.