Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage December 2007 Updates
December 30, 2007
Throttle Quad Complete.... - 2.0 hrs
Out to the hangar to cut the new bracket. Cut it.... drilled it.... ground it.... filed it... then back to the house to paint.
Scotchbrited it.... washed it.... dried it..... primed it..... and painted it black.
Reinstalled the bracket. Reinstalled the cables. Adjusted the clevis connections for smoothness.
Installed the 2 of the cotter pins and then dropped one. Never to be seen again. O well I have more at the hangar tomorrow. Thanks again to Dave and Bill for their documented tips on this process. Great finish for 2007.
Happy New Year Everyone! Time for a great 2008!
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |