Home
Preparation
Empennage
Wings
Fuselage
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage December 2005 Updates
December 31, 2005
Fuel Pump Doubler - 3.0 hrs
Since I have deceided on which engine now I am going back and adding the fuel pump doubler in the lower section of the firewall.
The plans gives you all the measurements to fab this piece. First I measured everything out and drilled the holes and then cut it out to size on the band saw. The new blade I bought from McMaster Carr thanks to Alan Wallace works much better than the ones that came with it.
Next I went over the aft section again and removed a few more rivets that were still not perfect. I tried some again but I really need a helper to get these right.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |