Fuselage December 2007 Updates
December 13, 2007
More wiring.... - 2.0 hrs

Anyone for spaghetti? Wires everywhere. This is very time consuming. I ran the rest of the avionics runs from the EXPbus to the terminal strips. AB2 thru AB6.

More pics of the dropdown panel with the terminal strips. Still looks like I have a long ways to go. Rats nest. But its coming together.




This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.