Fuselage August 2006 Updates
August 28, 2006
Right Gear Weldment.... - 2.0 hrs

More work on the right gear weldment. This one fit better once the floor stiffener was cut for clearance. After installing bolts I realized you are supposed to install the main gear and match drill the hole with a hole in the main gear before installing the weldments. Starting drilling and the bit started binding.

Called my buddy Jeff and he said I need to use a reamer. I wondered what those things are for :)



This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.