Fuselage April 2005 Updates
April 18, 2005
Bulkheads - 2.0 hrs

Installed the new bandsaw blade and this stuff cuts like butter. Cut the angles on the rear tied down and then cut the angles on the stab attach bars. Good thing I put the new blade on. These would of been a real bitch to cut straight with the old blade.

Final drilled the stab attach bars using the holes in the 711 bulkhead.

Used a 3/8 x 16 tap to tap threads in the rear tiedown piece.


This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.