Home
Preparation
Empennage
Wings
Fuselage
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage April 2006 Updates
April 11, 2006
Forward Fuselage Structure - 1 hrs
Well another great cross country trip. This time to Sun N Fun. I will post a photo page by the weekend. Now its time to get back to building.
Time to drill those corners. I used the close quarters drill shaft so I could get in around the clamps. Started with a pilot hole of #30 and then moved up to 3/16.
I tightened up the bolts to not be able to remove the clamps. Now I can add the bottom skin back and finish the match drilling and add the bottom floor longerons.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |