Finish Kit Update September 2010 Updates
September 26, 2010
AP Wire Route and Panel Labels..... - 2.0 hrs

Well its finally getting cooler but not quite today. It was cool first thing in the morning but the humidity is still high. Rolled in this morning to get some things done. Need to route the autopilot wire harness over to the right fuselage wing exit. I routed down the fuel vent line and tire wraped it to keep it from moving around.

I also wrapped it with wire wrap for the part that will run behind the carpet flooring and will tuck this under the floor angle. I ran it thru 2 plastic bushings to pass it thru the wing spar channel. Then routed it out the side of the fuselage.

Next will be to terminate the wires to a DB25 male and the wing side will be the same thing to a DB25 female.

Last I used some labels I picked up from ACS to label the alternate air, autopilot, elevator trim and flap switch.

And the last picture is my son Derek and his girlfriend Eilish. It was homecoming weekend at Langham and they went to the game Friday and the dance last night. The Lobos won again 45 to 28. I think they had a good time!



This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.