Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Finish Kit Update February 2012 Updates
February 20, 2012
Canopy drilling and final trim to the rear...... - 5.0 hrs
Ok finally warmed up enough today to get back to the canopy and its Presidents day so I had off work. Pulled the crate out in front of the hangar and fired up the generator.
First I marked the front and rear bow on 2 inch spacing. Next I drilled each hole to #40. Removed the canopy from the frame and drilled each hole with a plexi bit to #30. Next I used a #30 countersink tool on each hole.
Next I drilled each hole on the front are rear bows of the canopy frame to #30. Dimpled the middle alum strip and checked the fit to the canopy. Deburred the canopy frame to clean up the holes.
Installed the frame to the fuselage. Clecoed the canopy in place on the frame and checked the rear bow and the front bow to the windscreen. It appears there are several low spots that will need to be shimmed up to match the windscreen.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |