Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Finish Kit Update December 2010 Updates
December 11, 2010
Left Wing Root Fairing ..... - 3.0 hrs
Got to the hangar and removed the left wing root fairing. I remembered I had to safety wire the bolt for the tank bracket. I used the big hole in the middle of the bracket to hold the wire.
Next I glued a backing strip to the wing tip with epoxy and left it to dry. While that was drying I moved back to the wing root fairing. I needed to install the nutplates to the wing edge. I was running out of time as I promissed Jim I would head out to Hooks to help him with some rivets.
I headed over to help Jim and then when I returned I installed the nutplates to the top holes. I installed it to show how it would look. I also used the edge bender from Cleaveland Air Tools. Works really good.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |