Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Finish Kit Update December 2010 Updates
December 05, 2010
More Right Wing Tip Work ..... - 2.0 hrs
Primed and installed the wingtip rib. Then redrilled the tip to the wing. As you can see from the pic much better this time.
Next I marked and cut out the backing strips.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |