Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Finish Kit Update August 2012 Updates
August 12, 2012
Putting the Bird back together...... - 6.0 hrs
Another long day in 100 plus heat. Started out the morning cleaning out the tail section. 8 years of buildup back there during construction. Vaccumed out all the dust and looked everything over before closeing up the bulkhead. I had one stick on tiewrap point that came loose so reinstalled a new one and tiewrapped the static tube to it.
Moved on to the baggage area and installed the flap rod covers. Then the carpet. Moving to the seat pan area. Lots of buildup in this area. Started installing the screws. Had to take lots of breaks for water.
Installed the Kogar sunscreen and tapped the holes for the velcro pieces that holds the shade in the forward position. Almost got the seat pans completed but rain out of gas. ITs just too freakin HOT!
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |