Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Finish Kit Update August 2012 Updates
August 08, 2012
Preping for Inspection...... - 2.0 hrs
Working on the final prep stuff for the inspection.
Installed the lock I bought to lock the canopy. There are various types. This one slides over the track and you drill a small #30 hole for a pin to screw into. Came with a small Master combo lock. Works like a champ.
Just found out the data plate has to be on the plane for inspection. It only needs 3 pieces of info. Builder Name, Model No., and Serial No. However these have to match the paper work exactly. Even name order.... So Luckily I had purchased the EAA package way back and it came with a data plate. Now where to get engraved. I did a google search and the only place I could find that could do it quickly was Things Remembered. Took it in and they had it done in an hour.
Next I removed the front nose gear fairing. Using labled cups for the hardware and will put the cups in a box. Replacing all the screws with stainless. Caught the sun going down over Kerby's hangar. Cool shot.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |