Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Finish Kit Update April 2011 Updates
April 07, 2011
ShowPlanes Flap Position Controller ..... - 1.0 hrs
Brian from ShowPlanes called me today at work and gave me some tests to run on the controller. So off to the hangar after work. Once I ran the tests I shot some pics of the wiring behind the panel that will get covered with the top skins. I sure hope I never have to crawl under there to do anything.
After the pics I got the top skin out and removed all the firewall clecos out. I position the skin in place and installed the brace that runs from the roll bar down to the top of the fuselage. I will need a helper to install these bolts as I cannot reach across from one side to the other.
So next I installed the GPS antenna and tied up the wires behind the GPS. Now we should be ready to go once I get the helper.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |