Engine Update September 2008 Updates
September 11, 2008
Batton Down the Hatches for IKE.... - 0.0 hrs
Well been gettin no work done on the plane this week. All the talk and planning at work has been about Hurricane IKE.
Today after work I started bolting down things like I did last month for Eduard. What a pain in the A$$. Better safe than sorry though.
Very strange out here. All the planes are almost gone. There are 6 planes tied down outside. This makes me very nervous with things that could come loose and go flying. There are 2 of these up by the gas pumps. At least they pretty far from my hangar.
After bolting the hangar doors in place I took pictures of everything before the storm. I hope everything holds.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |