Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Fuselage May 2008 Updates
May 12, 2008
More Mixture Bellcrank Work.... - 2.0 hrs
Ok so now it is time to get this mixture bracket done. I marked both sides and started with the grinder. I worked on one side and then the other. Keeping the edges even. Worked out pretty easy.
Then I used the diegrider with a scotchbrite disk to remove the loose powdercoat. Next I will see if Dru will let me sandblast it at his hangar.
I tried out the fit and it looks like it will work out nice. I mounted the back bracket for the cable holder.
Now if I can JB Weld a stiffener I am in business. It actually looks good the way it is. Just not sure of what the vibrations will do to it over time. Just seems better to beef it up a bit.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |