Engine Update June 2009 Updates
June 20, 2009
Fab Work.... - 4.0 hrs

Today I remounted the FAB to the engine. I made up the parts to hold the airfilter in the left intake floor. I need to get this trimmed up enough to allow the bottom cowl to be installed again for fit checking.

After that I removed the floor and bent the front edge over at a 90 degree for stiffness. Next I fabbed up a bracket to mount along the front edge of the FAB box.







This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.