Engine Update June 2009 Updates
June 20, 2009
Fab Work.... - 4.0 hrs
Today I remounted the FAB to the engine. I made up the parts to hold the airfilter in the left intake floor. I need to get this trimmed up enough to allow the bottom cowl to be installed again for fit checking.
After that I removed the floor and bent the front edge over at a 90 degree for stiffness. Next I fabbed up a bracket to mount along the front edge of the FAB box.