Home
Preparation
Empennage
Wings
Fuselage
Engine
Finish Kit
Favorite Links
W & B Calculator
Van's Aircraft
Email Me
|
|
Engine Update July 2009 Updates
July 18, 2009
Baffles and Cowl.... - 5.0 hrs
Today I mounted a door on some 2 x 4's and set it up as a table. Then to make a smooth surface I mounted a piece of quarter inch plywood on it. Should work out great.
Next it was lunch time and the RV builders group was meeting at Carls BBQ. After everyone came down to check out my plane.
Then it was time to get back to triming the baffles. Still trying to get the spacing correct for the rubber seal that mounts to the cowl top.
Next I mounted the nut plates on the inside of the inlets.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |