Engine Update January 2009 Updates
January 29, 2009
Baffles.... - 2.0 hrs

Well I usually do not log study time but tonight was worth it. The new baffle kit is awesome. Lots of extra parts to save you on fabrication time. Excellent plans and instructions. I bet this is how the RV-12 looks.

Anyway I inventoried everything and then started going over the different steps. Looks like this should go together really well. Its very step by step and so far it looks like very minimal fabrication. It even steps you thru how to make bends.

We shall see how it goes as I am going to take it step by step all the way thru and just see how complete it works out.





This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.