Home
Preparation
Empennage
Wings
Fuselage
Finish Kit
Favorite Links
Van's Aircraft
Email Me
|
|
Empennage June Updates
June 26, 2004
Vertical Stabilizer.
Riveted the right side of the VS. The first 3 rivets came out too thin on the shop head. I drilled out each rivet and tried lowering the pressure to 40lbs. This worked much better. I only had to drill out 1 more bad rivet.
This website was built to document my work in compliance with the FAA requirements
needed to certify my aircraft. My experiences and comments are by no means to be
considered as instructions on how to build any aircraft.
|
| |